01

Plan installation before shipment

The archived installation method describes a conveyor assembled and tested before being separated into shipping subassemblies. Matching each section with its labelled parts reduces uncertainty during reassembly.

02

Prepare the site for reassembly

A configuration made to the specified route can avoid field cutting and surplus material, but the receiving site still needs verified supports, clearances, power, controls and safe access before installation begins.

  • Confirm the drawing and section labels
  • Set and level the supports before joining the route
  • Verify transfers and guarding before operation
  • Commission the line with the intended products and rates